Commercial & industrial heating across Oxfordshire

Oxyplumb Commercial · Oxfordshire

Commercial hot-water systems in Oxfordshire

From school showers to a busy staff kitchen, dependable hot water matters. We can help with commercial water-heater and cylinder installation, replacement and servicing across Oxfordshire.

Lochinvar commercial water heater installed at Burford School
  • Commercial water heaters and large cylinders
  • Calorifiers and instantaneous water heating
  • Associated pumps, controls and distribution pipework
  • Equipment servicing and plant-room upgrades

Explore by manufacturer

Four ways to start your commercial hot water project.

Compare dedicated water heaters and indirect storage. We’ll help you understand recovery, peak demand and the connections around the equipment.

Andrews MAXXflo EVO commercial water heater

Direct gas-fired commercial hot water

Andrews Water Heaters

When hot water is essential to your working day, the replacement needs more thought than matching the old cylinder size. We can help plan an Andrews water-heater installation or look after the equipment already on site.

Explore Andrews Water Heaters
Gledhill StainlessLite Plus indirect hot-water cylinder

Indirect storage for suitable building demands

Gledhill

Need dependable hot water for staff facilities or a smaller commercial building? We can help assess whether a Gledhill cylinder suits the demand and how it should connect to the rest of the system.

Explore Gledhill
Lochinvar EcoShield commercial storage water heater

Dedicated hot-water equipment and local project experience

Lochinvar

We know how important reliable hot water is to an occupied building. Oxyplumb Commercial can help with Lochinvar installation, replacement and servicing, drawing on completed commercial hot-water work in Oxfordshire.

Explore Lochinvar
Hamworthy Halstock stainless-steel calorifier

Commercial calorifiers and water-heating arrangements

Hamworthy

A commercial hot-water upgrade needs the storage and heat source to work together. We can help you review Hamworthy equipment and plan installation, replacement or maintenance around the building.

Explore Hamworthy

Equipment choices · practical advice

Hot water that keeps up when everyone needs it.

A cylinder’s size is only part of the answer. We’ll ask when showers, kitchens and washbasins are busiest, how quickly the system recovers and how far hot water has to travel. That helps us compare the right equipment without simply specifying a larger tank.

Andrews MAXXflo EVO

Andrews MAXXflo EVO

This Baxi commercial range brings gas-fired water heating and storage together. It is an option to assess where you need a dedicated hot-water appliance rather than relying entirely on the space-heating boilers.

  • Single- and twin-burner arrangements within the range
  • Check peak draw-off, recovery, gas supply and flues

Andrews MAXXflo EVO by Baxi (opens in a new tab)

Andrews SUPAflo EVO 2

Andrews SUPAflo EVO 2

For larger hot-water requirements, we can discuss this commercial water-heater range as part of a properly sized system. Distribution, storage arrangements and available plant space belong in the same conversation.

  • Consider the whole hot-water load
  • Agree controls and future servicing access

Andrews SUPAflo EVO 2 by Baxi (opens in a new tab)

Gledhill StainlessLite indirect cylinders

Gledhill StainlessLite indirect cylinders

An indirect cylinder uses a coil supplied by the heating system. Gledhill’s range includes several storage sizes; we assess whether its recovery and capacity suit the particular premises rather than treat every cylinder as a high-demand commercial solution.

  • Review coil performance and available boiler output
  • Include expansion, safety and discharge arrangements

Gledhill StainlessLite indirect cylinders (opens in a new tab)

Which approach fits your premises?
OptionWhen to consider itWhat we check
Dedicated gas-fired water heaterHot water independent of the space-heating boilerPeak demand, recovery, flue route and fuel supply
Indirect unvented cylinderStored hot water heated by a connected boilerCoil duty, storage, incoming water and safety discharge
Multiple or bespoke cylindersSites needing a different storage or changeover arrangementSpace, redundancy, distribution losses and control strategy

A useful first conversation

Bring us the problem. We’ll help with the options.

You do not need to know the answer before getting in touch.

Choose hot water and pressure support
  • Count the outlets likely to run together.
  • Explain peak shower, laundry or kitchen periods.
  • Flag any areas where supply cannot be interrupted.
  • Include your water-risk assessment and operating requirements where available.
Talk to our commercial team about your project

Hot water when your building needs it

A boarding house, changing room and office kitchen all use hot water differently. Tell us where your supply falls short and when it is busiest. We can help you look at the water heater, storage and connected pipework together.

  • Commercial water heaters, cylinders, calorifiers and instantaneous systems.
  • Return pumps, connected controls, valves and hot-water pipework.
  • Plant-room access, removal of old equipment and connections to the existing supply.
  • Agreed shutdowns, commissioning arrangements and the facilities needed while work takes place.

A school water-heater replacement with a fixed return date

At Burford Boarding School, the Oxyplumb Commercial team replaced a Lochinvar LPG water heater and hot-water return pump within a ten-day programme before pupils returned. You can see the work and equipment in the project photographs.

Before you arrange the work

Do we need another cylinder or a different type of water heater?

We can help you compare the options. How much hot water you use, how quickly it needs to recover, the available supply and the space all matter. Burford needed a commercial water heater, while the museum project used on-demand hot water. We will look at what suits your building.

Related commercial projects

Related support: Commercial plumbing · Plant-room upgrades.

Discuss your site and equipment

How we work

Start with daily demand.

The facilities served, peak use and periods when hot water is essential shape the project. We review the existing plant and agree any supply interruptions before arranging the work.

View the Burford School project
  1. 01

    Understand the demand

    Tell us about the facilities served and how hot water is used throughout the day.

  2. 02

    Review the existing plant

    Share equipment details, photographs and any known issues.

  3. 03

    Plan the work

    Agree the scope and any interruption arrangements before work is booked.

Useful to know

Your questions.

Can you help with ageing hot water equipment?

Yes. We can discuss the existing installation and whether your project involves servicing, repair enquiries or replacement work.

Can you work around a busy site?

We discuss access and operational restrictions when planning the work. Tell us about the periods when hot water availability is particularly important.

What details do you need?

Send the site location, the equipment make and model, photographs and a brief explanation of the work or issue. Existing records are helpful if available.

Independent customer feedback

Hundreds of five-star reviews. See for yourself.

You want to feel comfortable with the people working in your building. Take a look at Oxyplumb’s independent customer feedback, then tell our commercial team how we can help.

Verified customer reviews

Which? Trusted Traders

4.9/5

from 260 reviews

99% of customers recommend Oxyplumb on the official profile.

View Which? reviews

Google and Which? rating figures checked on 21 October 2026.

YOUR NEXT STEP

Let’s talk about your building.

Speak to our commercial team about your site and the work you need.

Discuss your hot water plant01993 259029

Oxfordshire & the Cotswolds

Hot water when your building needs it

Schools, care settings and commercial premises across Oxfordshire and the Cotswolds need hot-water systems matched to their busiest periods. We can help you review storage, recovery and distribution, whether you are replacing equipment or adding facilities.

Let’s talk about your building

Not sure where to start?

Tell us the postcode, number of outlets, busy periods and whether hot water must remain available during the work.

Discuss your local project

Completed Oxyplumb work

Commercial hot water in Burford

See the Lochinvar water-heater replacement and new return pump at Burford Boarding School.

Read the project story