Commercial project
Burford Boarding School
One-day Lochinvar hot-water heater replacement
The project
A split water heater was replaced like-for-like with a Lochinvar LGC285-560, converted for LPG. Oxyplumb completed the work in one day during the school holidays, ahead of the new term.
Existing pipework and the flue were reused following an integrity test. A faulty hot-water return pump was also identified and replaced, avoiding a long cold-water draw before hot water reached the outlets.