
Commercial project
Vale & Downland Museum
Twin-boiler replacement in a museum
Our work
The existing system
The museum’s heating was served by two older Vaillant boilers.
The replacement
The replacement scope comprises two Worcester Bosch Greenstar 8000+ 35kW system boilers, a new low-loss header and individual system filters. High-level flues follow the existing route, with an access hatch for future servicing.
Working with the existing building
The design retains the existing system controls, motorised valves and downstream pumps, connecting new boiler plant to the museum’s established heating system.





